
work-breakdown-structure
WBS from scope + deliverables. Enforces 100% rule, mutually exclusive siblings, deliverable-oriented nodes, 8/80-hour sizing, depth-by-need (3–5 levels). Decomposition axes (deliverable / phase / responsibility / hybrid) consistent within branches. WBS dictionary per node (description, deliverable, acceptance, size, deps, risks). Milestones distinct from work. Intra-WBS dependencies + coverage matrix. Anti-patterns flagged.
- GitHub stars
- 1
Install
/plugin install work-breakdown-structure@svens-claude-pluginsRun it inside Claude Code after adding the marketplace with /plugin marketplace add SSiertsema/claude-code-plugins.
Contents
Discovered from sourceSkills 1
Sponsors
Details
- Marketplace
- SSiertsema/claude-code-plugins
- Source
- work-breakdown-structure
- Category
- planning
More from SSiertsema/claude-code-plugins
All 182- write-backend-documentation
- write-frontend-documentation
- xplore
- zero-trust-architecture
- ab-hypothesis-framing
- acceptance-criteria-writing
- accessibility-requirements
- adr-writing
- affinity-diagramming
- agent-meeting-room
- algorithm-design
- api-contract-specification
- api-design
- api-versioning-strategy
- architecture-pattern-selection
- architecture-tradeoff-analysis
- attack-surface-analysis
- authentication-strategy-design
- authorization-modeling
- baseline-management
- brainstorming
- build-vs-buy-analysis
- business-case-management
- business-process-modeling